Showing posts with label blades. Show all posts
Showing posts with label blades. Show all posts

20 May, 2019

transporting

the last of the blades and turbines to the Oweninny wind farm development in north Mayo.  It took a few months to get them all there.  They started transporting them in Janusry.  The photos were taken on the 16th of May.


loaded and ready to go